An energy performance contract without a separate budget
An engineering-systems upgrade can be started so that payment comes from the measured saving.
Read on
On site we first record the consumption profile and estimate the potential. The contract fixes the baseline and the measurement method. Work and equipment are financed from the future saving, not from a separate capital request. The calculator is a guide before an engineer visits.